1996
- Established TVP Trading Co., Ltd. - produced corrugated steel sheets and supplied steel coils and purlins.
2000
- Building steel pipe factory with capacity of 10,000 tons/year
2003
- Established TVP Steel Manufacturing & Trading Co., Ltd at 400 National Highway 1A, Quarter 9, Ben Luc Town, Ben Luc District, Long An Province.
- Steel pipe factory put into operation - production capacity of 20,000 tons/year.
2005
- Established galvanizing line with capacity of 70,000 tons/year
- Established color coating line with capacity of 40,000 tons/year
- Established slitting line No.1
2006
- Color coating line (capacity of 40,000 tons/year) put into operation.
- Deploying steel pipe factory No.2
2007
- Galvanizing line (capacity of 70,000 tons/year) put into operation
- Set up and used ISO 9001:2000 for production and business activities of the company.
2009
- Established and put into operation slitting line No.2
- Established galvanizing line No.2
- Upgrading the ISO system according to new standard ISO 9001: 2008
2010
- Received ISO 9001: 2008 certificate issued by BUREAU VERITAS UK organization.
- Galvanizing line (capacity of 80,000 tons/year) put into operation.
2011
- Installed color coating line No.2 (capacity of 80,000 tons/year)
- Received Certificate of Merit from the Prime Minister.
- Building steel pipe factory No.3
- Established Phuc Long industrial park and residential area.
2012
- Color coating line No.2 put into operation (capacity of 80,000 tons/year)
- Expanding the factory into Phuc Long industrial park
- Received the Government Emulation Flag
- Received the Third Class Labor Medal
2013
- Received ISO 9001: 2008 certificate issued by TUV 2 SUD organization
- Upgrading production capacity of color coating line No.1 to 60,000 tons/year
- Slitting lines No.3 and No.4 and steel pipe factory No.3 put into operation
2014
- Plate cutting line and cold rolling line for small width put into operation.
- Deploying cold rolling line with capacity of 40,000 tons/year of Tenova Group in cooperation with US I2S supplier.
2015
- Cold rolling line for large width put into operation.
- Deploying the Continuous Galvalume project with capacity of 300,000 tons/year of Italy’s Danieli
2016
- Continuous Galvalume line put into operation.
- Expanding Phuc Long Industrial Park Phase 2 with total area of 370 hectares.